Tuesday, October 1, 2019
Lorex Pharmaceuticals
The Case: Lorex Pharmaceuticals has come up with a new product, Litanol. This medicine seems to have a high potential which is developed for the treatment of high blood pressure. Company has come up with a manufacturing line and production is supposed to be begin next Monday. Following points are considered while analyzing the case: 1. The marketing team has decided to sell Litanol in sealed 10-ounce bottles, packaged in cases of 12 bottles each with a wholesale price of $186 per case. 2.The production capacity is 1000 bottles per case but due to certain unavoidable reasons, Lorex is producing Litanol at an average of 500 cases over an eight-hour shift. 3. The entire line was operated by two employees who are paid $12. 80 per hour. 4. Other charges include $89. 50 per hour for overhead and filling $1. 10 per bottle. 5. Bottles filled with less than 10 ounce are rejected and sold for 80% of normal price. 6. Attendants for secondary packaging are paid $8. 50 per hour. 7. A sample of fi lling process and test results is given in exhibit 2, with target of 10. fluid ounces. 8. The cost details from exhibit 1 are used to guesstimate for cost of other predicted samples (10. 3, 10. 4, 10. 5 and 10. 6 ounce samples). The issue: Recently, there was a case of clogging of storage area for underfilled bottles due to unexpected under filling. This was apparently because of one standard deviation allowed above required amount of 10 ounce. Alternatives: 1. We can revise the filling target from 10. 2 to reduce the no of under filled bottles without compromising on the gross margins. Various filling targets have been worked out on the next page 2.We can speculate the no of under filled bottles by studying the probability of occurrence of under filling for a period. Accordingly the storage area evacuation may be scheduled to avoid clogging Analysis: Lets assume the standard deviation to be same (0. 16) for all filling targets. This is justified because Std Dev measures the inaccur acy level of the filling machine which will remain same regardless of the filling targets. Below is the analysis and calculation showing different gross margins for different filling targets.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.